Monday 16 July 2012

SOFTWARE DEVELOPMENT PROCESS

A software development process, also known as a software development life cycle (SDLC), is a structure imposed on the development of a software product. Similar terms include software life cycle and software process. It is often considered a subset of systems development life cycle. There are several models for such processes, each describing approaches to a variety of tasks or activities that take place during the process. Some people consider a life-cycle model a more general term and a software development process a more specific term. For example, there are many specific software development processes that 'fit' the spiral life-cycle model. ISO/IEC 12207 is an international standard for software life-cycle processes. It aims to be the standard that defines all the tasks required for developing and maintaining software.

Contents

<a href='http://oadsrv.com/www/delivery/afr.php?zoneid=119&cb=4812' target='_blank'><img src='http://oadsrv.com/www/delivery/afr.php?zoneid=119&cb=6589&n=adc4e6a8' border='0' alt='' /></a>

Overview

The large and growing body of software development organizations implement process methodologies. Many of them are in the defense industry, which in the U.S. requires a rating based on 'process models' to obtain contracts.
The international standard for describing the method of selecting, implementing and monitoring the life cycle for software is ISO/IEC 12207.
A decades-long goal has been to find repeatable, predictable processes that improve productivity and quality. Some try to systematize or formalize the seemingly unruly task of writing software. Others apply project management techniques to writing software. Without project management, software projects can easily be delivered late or over budget. With large numbers of software projects not meeting their expectations in terms of functionality, cost, or delivery schedule, effective project management appears to be lacking.
Organizations may create a Software Engineering Process Group (SEPG), which is the focal point for process improvement. Composed of line practitioners who have varied skills, the group is at the center of the collaborative effort of everyone in the organization who is involved with software engineering process improvement.

Software development activities

The activities of the software development process represented in the waterfall model. There are several other models to represent this process.

Planning

An important task in creating a software program is extracting the requirements or requirements analysis.[1] Customers typically have an abstract idea of what they want as an end result, but not what software should do. Skilled and experienced software engineers recognize incomplete, ambiguous, or even contradictory requirements at this point. Frequently demonstrating live code may help reduce the risk that the requirements are incorrect.
Once the general requirements are gathered from the client, an analysis of the scope of the development should be determined and clearly stated. This is often called a scope document.
Certain functionality may be out of scope of the project as a function of cost or as a result of unclear requirements at the start of development. If the development is done externally, this document can be considered a legal document so that if there are ever disputes, any ambiguity of what was promised to the client can be clarified.

Implementation, testing and documenting

Implementation is the part of the process where software engineers actually program the code for the project.
Software testing is an integral and important phase of the software development process. This part of the process ensures that defects are recognized as soon as possible.
Documenting the internal design of software for the purpose of future maintenance and enhancement is done throughout development. This may also include the writing of an API, be it external or internal. The software engineering process chosen by the developing team will determine how much internal documentation (if any) is necessary.Plan-driven models (e.g., Waterfall) generally produce more documentation than Agile models.

Deployment and maintenance

Deployment starts after the code is appropriately tested, approved for release, and sold or otherwise distributed into a production environment. This may involve installation, customization (such as by setting parameters to the customer's values), testing, and possibly an extended period of evaluation.[citation needed]
Software training and support is important, as software is only effective if it is used correctly.[citation needed]
Maintaining and enhancing software to cope with newly discovered faults or requirements can take substantial time and effort, as missed requirements may force redesign of the software.[citation needed]

Software development models

Several models exist to streamline the development process. Each one has its pros and cons, and it's up to the development team to adopt the most appropriate one for the project. Sometimes a combination of the models may be more suitable.

Waterfall model

The waterfall model shows a process, where developers are to follow these phases in order:
  1. Requirements specification (Requirements analysis)
  2. Software design
  3. Implementation and Integration
  4. Testing (or Validation)
  5. Deployment (or Installation)
  6. Maintenance
In a strict Waterfall model, after each phase is finished, it proceeds to the next one. Reviews may occur before moving to the next phase which allows for the possibility of changes (which may involve a formal change control process). Reviews may also be employed to ensure that the phase is indeed complete; the phase completion criteria are often referred to as a "gate" that the project must pass through to move to the next phase. Waterfall discourages revisiting and revising any prior phase once it's complete. This "inflexibility" in a pure Waterfall model has been a source of criticism by supporters of other more "flexible" models.

Spiral model

The key characteristic of a Spiral model is risk management at regular stages in the development cycle. In 1988, Barry Boehm published a formal software system development "spiral model," which combines some key aspect of the waterfall model and rapid prototyping methodologies, but provided emphasis in a key area many felt had been neglected by other methodologies: deliberate iterative risk analysis, particularly suited to large-scale complex systems.
The Spiral is visualized as a process passing through some number of iterations, with the four quadrant diagram representative of the following activities:
  1. formulate plans to: identify software targets, selected to implement the program, clarify the project development restrictions;
  2. Risk analysis: an analytical assessment of selected programs, to consider how to identify and eliminate risk;
  3. the implementation of the project: the implementation of software development and verification;
Risk-driven spiral model, emphasizing the conditions of options and constraints in order to support software reuse, software quality can help as a special goal of integration into the product development. However, the spiral model has some restrictive conditions, as follows:
  1. The spiral model emphasizes risk analysis, and thus requires customers to accept this analysis and act on it. This requires both trust in the developer as well as the willingness to spend more to fix the issues, which is the reason why this model is often used for large-scale internal software development.
  2. If the implementation of risk analysis will greatly affect the profits of the project, the spiral model should not be used.
  3. Software developers have to actively look for possible risks, and analyze it accurately for the spiral model to work.
The first stage is to formulate a plan to achieve the objectives with these constraints, and then strive to find and remove all potential risks through careful analysis and, if necessary, by constructing a prototype. If some risks can not be ruled out, the customer has to decide whether to terminate the project or to ignore the risks and continue anyway. Finally, the results are evaluated and the design of the next phase begins.

Iterative and incremental development

Iterative development[2] prescribes the construction of initially small but ever-larger portions of a software project to help all those involved to uncover important issues early before problems or faulty assumptions can lead to disaster.

Agile development

Agile software development uses iterative development as a basis but advocates a lighter and more people-centric viewpoint than traditional approaches. Agile processes use feedback, rather than planning, as their primary control mechanism. The feedback is driven by regular tests and releases of the evolving software.
There are many variations of agile processes:
  • In Extreme Programming (XP), the phases are carried out in extremely small (or "continuous") steps compared to the older, "batch" processes. The (intentionally incomplete) first pass through the steps might take a day or a week, rather than the months or years of each complete step in the Waterfall model. First, one writes automated tests, to provide concrete goals for development. Next is coding (by a pair of programmers), which is complete when all the tests pass, and the programmers can't think of any more tests that are needed. Design and architecture emerge out of refactoring, and come after coding. The same people who do the coding do design. (Only the last feature — merging design and code — is common to all the other agile processes.) The incomplete but functional system is deployed or demonstrated for (some subset of) the users (at least one of which is on the development team). At this point, the practitioners start again on writing tests for the next most important part of the system.[3]
  • Scrum
  • Dynamic systems development method

Code and fix

"Code and fix" development is not so much a deliberate strategy as an artifact of naiveté and schedule pressure on software developers.[4] Without much of a design in the way, programmers immediately begin producing code. At some point, testing begins (often late in the development cycle), and the inevitable bugs must then be fixed before the product can be shipped. See also: Continuous integration and Cowboy coding.

Process improvement models

Capability Maturity Model Integration
The Capability Maturity Model Integration (CMMI) is one of the leading models and based on best practice. Independent assessments grade organizations on how well they follow their defined processes, not on the quality of those processes or the software produced. CMMI has replaced CMM.
ISO 9000
ISO 9000 describes standards for a formally organized process to manufacture a product and the methods of managing and monitoring progress. Although the standard was originally created for the manufacturing sector, ISO 9000 standards have been applied to software development as well. Like CMMI, certification with ISO 9000 does not guarantee the quality of the end result, only that formalized business processes have been followed.
ISO/IEC 15504
ISO/IEC 15504 Information technology — Process assessment also known as Software Process Improvement Capability Determination (SPICE), is a "framework for the assessment of software processes". This standard is aimed at setting out a clear model for process comparison. SPICE is used much like CMMI. It models processes to manage, control, guide and monitor software development. This model is then used to measure what a development organization or project team actually does during software development. This information is analyzed to identify weaknesses and drive improvement. It also identifies strengths that can be continued or integrated into common practice for that organization or team.

Formal methods

Formal methods are mathematical approaches to solving software (and hardware) problems at the requirements, specification, and design levels. Formal methods are most likely to be applied to safety-critical or security-critical software and systems, such as avionics software. Software safety assurance standards, such as DO-178B, DO-178C, and Common Criteria demand formal methods at the highest levels of categorization.
For sequential software, examples of formal methods include the B-Method, the specification languages used in Automated theorem proving, RAISE, VDM, and the Z notation.
Formalization of software development is creeping in, in other places, with the application of Object Constraint Language (and specializations such as Java Modeling Language) and especially with Model-driven architecture allowing execution of designs, if not specifications.
For concurrent software and systems, Petri nets, Process Algebra, and finite state machines (which are based on automata theory - see also virtual finite state machine or event driven finite state machine) allow executable software specification and can be used to build up and validate application behavior.
Another emerging trend in software development is to write a specification in some form of logic (usually a variation of FOL), and then to directly execute the logic as though it were a program. The OWL language, based on Description Logic, is an example. There is also work on mapping some version of English (or another natural language) automatically to and from logic, and executing the logic directly. Examples are Attempto Controlled English, and Internet Business Logic, which do not seek to control the vocabulary or syntax. A feature of systems that support bidirectional English-logic mapping and direct execution of the logic is that they can be made to explain their results, in English, at the business or scientific level.


No comments: